Leave a Message

Thank you for your message. I will be in touch with you shortly.

Background Image

Bayfront Park Is Closed Until 2027. That's Not the Biggest Change Coming to Olde Towne Daphne.

August 13, 2026

Walk west on Bayfront Drive past Moe's Original BBQ and you hit a chain link fence. That's the boundary now. Everything past it, the parking lot, the community center that used to sit here, the open lawn that ran down to Mobile Bay, is construction site. It has been since October 27, 2025, and it will stay that way for another eight months at least, with the city targeting a spring 2027 reopening timed to Daphne's centennial.

Most residents already know the park is closed. What's easy to miss is that the fence around Bayfront Park is the smallest piece of what's actually happening to this stretch of town right now. In the same nine months the park has sat behind construction fencing, the city council approved public financing for a $30 million hotel two blocks away, a contested mixed-use building cleared the planning commission on Main Street, and the town's oldest arts festival made its move to a new home permanent. The park closure isn't an isolated inconvenience. It's the most visible piece of a coordinated bet the city is making on what Olde Towne Daphne becomes next.

The Park That Disappeared

The number that gets repeated most often for the Bayfront Park project is $15 million, the figure the City of Daphne uses in its own public announcements. WKRG has reported it as a $16 million project, and back when the city announced the closure in October 2025, a Daphne official put the figure at $13.5 million. The range tells you something on its own: this is a project whose scope has been evolving even as it broke ground.

What isn't in dispute is what's being built. A 2,500-seat amphitheater with a 90-foot stage, a splash pad, new restrooms, expanded parking, and a boardwalk system that will eventually connect Bayfront Park to the D'Olive Bay boat launch. Part of the funding comes from a $7.2 million GOMESA grant the state awarded the city in 2023, routed through the Alabama Department of Conservation and Natural Resources.

If you want to still get to the pier while all this is underway, you can, on foot, through Village Point Park Preserve via the Al Guarisco Boardwalk and Trail. Vehicle access to Bayfront Drive itself is closed from Moe's westward to the water.

A Construction Equipment Guide report from May 2026, the most recent detailed update available, quotes Triptek Construction project manager Mark Rodgers describing the site work behind the scenes: clearing the upper parking lot, filling wetlands, cutting the path for the future boardwalk, and working around a damaged pipe that forced an unplanned redesign. Mayor Robin LeJeune told the same outlet the project remains on budget. The city has floated a concert at the finished amphitheater for fall 2027 as part of its centennial celebrations, which puts the actual public payoff more than a year out from today.

Here's how the two phases of the Bayfront Park project compare:

Phase 1 (completed 2024) Phase 2 (underway now)
Cost $3 million $15–16 million
Funding City-funded GOMESA grant + city funds
Scope Parking, sidewalks, lighting, road resurfacing, pier repairs Amphitheater, splash pad, restrooms, boardwalk network
Closure length About one year October 2025 to spring 2027
Public access during work Park closed, pier closed Park closed, pier reachable via Village Point Park

Phase one, the streetscape and traffic circle work that wrapped in early 2024, closed the park for about a year and reopened to residents who told local reporters they liked the new parking and the brickwork. Phase two is a longer closure building something the town has never had.

What's Rising Around the Gap

While the park sits fenced off, the city has been clearing the way for private investment nearby. In January 2026, the Daphne City Council approved an $8 million incentive package for a $30 million boutique hotel project in Olde Towne, developed under the entity TFH Daphne 2026 LLC and reported locally as the Fortuna Hotel. The financing structure is a tax-increment arrangement: the city issues an interest-free warrant, and repayment comes only from a 75/25 split of the tax revenue the hotel itself generates, capped at $8 million or 25 years, whichever comes first, with a final deadline of January 1, 2061 if neither cap is hit sooner.

Mayor LeJeune has framed the hotel as a way to keep visitors in Daphne who might otherwise stay on the interstate or head south to Fairhope. That's a specific and telling detail. It means the hotel bet and the park bet are the same bet: build something that gives outside visitors a reason to park their car in Olde Towne and stay a while, rather than passing through.

Not every resident has welcomed the pace of change. A three-story mixed-use building at the corner of Van Avenue and Main Street, restaurant and retail on the ground floor, offices above, cleared Daphne's planning commission last August over a standing-room-only crowd of objectors. One neighbor, whose family has lived on Van Avenue for three generations, told a local TV reporter the project was upending everything he'd known about calling that block home. Parking capacity, sized under an ordinance written for a small historic district, was the practical complaint. The larger one, unspoken but audible in the room, was pace. Olde Towne has operated for decades as a place defined by its scale. A hotel, a splash-pad amphitheater, and a three-story office building arriving within the same twelve months is a different scale.

The Festival That Already Moved

Not every change downtown has been contested. The Jubilee Festival of Arts, one of Alabama's longest-running juried art shows, made its move to Lott Park permanent, and the 2026 event is set for October 17 and 18 with more than 140 artists expected, plus the Jubilee Market for local food makers and a Kids Art area sponsored by OWA Parks & Resort. Parking will run through Daphne Elementary on the north end and Daphne City Hall on the south, the same civic footprint that's absorbing the hotel and the amphitheater.

That's worth sitting with. The festival didn't need to move because of construction. It moved because Lott Park offered more room to grow, over 140 artists compared to the roughly 100 the show hosted in earlier years. Every major civic asset in Olde Towne right now, the park, the festival, the new hotel, is being resized for a bigger audience than the one that's lived here.

The Weekend In Between

None of this means downtown is dark. It means the calendar has shifted toward the Civic Center while Bayfront Park is out of commission. Two events worth knowing about this month:

  • Taste of the Eastern Shore, Saturday, August 22, 2026, 6:00 PM at the Daphne Civic Center
  • 2nd Annual Alabama Elvis Festival, Thursday, August 27, 2026, 2:00 PM, also at the Civic Center

If you're looking for a downtown meal while the waterfront lawn is fenced off, Olde Towne's restaurant row hasn't gone anywhere. Southwood Kitchen on US 98 is still doing its casual fine-dining thing at the neighborhood bar. Kitchen On Main keeps its playful American menu going in the heart of the district. The Waterfront and East Shore Cafe round out the options within a few blocks of Main Street. None of them are behind the fence.

One more thing worth flagging if you're routing around town this month: the Milton Jones Road extension has closed the intersection at County Road 13 from May 4 through the end of August, a separate project connecting Pollard Road to Highway 181. It's not related to the Bayfront work, but it's one more reason August has felt like a detour-heavy month if you live on the east side of town.

The Bet Underneath It All

Put the pieces next to each other and the pattern is hard to miss. A park closed for about a year and a half to build something the old community center that stood there never could have hosted. A hotel financed by the city itself, structured so its own tax revenue pays for it. A festival that outgrew its old footprint and moved to make room for more. A contested office building that residents fought and lost. Every one of these is a story about capacity, about Olde Towne being rebuilt to hold more people than it currently does.

That's not a criticism. It's just the fact underneath the fence. Whether that turns out to be a fair trade for the neighborhood that exists today is something residents will be arguing about long after the amphitheater opens.

If you're watching these changes because you're thinking about what they mean for your own place in Daphne, or you're curious what a home near Olde Towne might be worth once the amphitheater and the new hotel are finished, Shannon King Jha knows this stretch of the Eastern Shore block by block. Request Your Home Valuation and get a read on where your property stands today, not just where the city hopes the neighborhood is headed.

Follow Us On Instagram